gary navarre on wed 8 jun 11
Hey Folks,
Man this faster connection has made it a lot easier to keep up with presen=
t time and how this new kiln load is doing. For about the last month I've m=
anaged to glaze and load the new pots in the tail setting and the rest of t=
he Mid-tail...
http://www.youtube.com/watch?v=3D4_gwOcHCsBg (4:09)
and http://www.youtube.com/watch?v=3D8f5_SzU3gYI (3:58)
... with some Morel mushroom hunting results at the end.
The Mid-front and Front settings of the load used up all my 12"x24" kiln s=
helves ...
http://www.youtube.com/watch?v=3DP7TrNgiVlxE (15:06)
... for this I took a bunch of shorter clips and put them all together for =
one 15 minute movie.
Stay tuned for the firing which started about 3 AM Wednesday, June 8, 2011=
with a couple cans of charcoal. I'm probably gonna keep her under 150F for=
at least 24 hours, maybe longer, to dry any fresh clay and give me a chanc=
e to rest up after bricking up the door so stay in there eh and thanks for =
taking time to study what I'm making.
Gary Navarre
Navarre Pottery
Navarre Enterprises
Norway, Michigan, USA
http://www.NavarrePottery.etsy.com
http://www.youtube.com/GindaUP
http://public.fotki.com/GindaUP/
| |
|