Connie Christensen on mon 23 sep 02
This is so exciting, I'm getting a new gas kiln, still can't believe it. =
It's being built by a local kiln builder and should arrive within 6-8 =
weeks. It will have forced air burners and I've never fired a kiln with =
them before. A new challenge. If I were younger, I would have considered =
building a kiln myself.=20
I also have a new e-mail address: connie@mudmaven.com. Switched from an =
old Mac with a broken modem to a PC (Ugh) and cable internet and managed =
to sign off clayart and back on with the new e-mail address and didn't =
have to bug Mel once. Amazing.=20
I'll probably be back with questions after I've tried my first firing.
-Connie Christensen
| |
|