plaster hump molds/ pre-prep

updated wed 27 nov 02

 

Valice Raffi on tue 26 nov 02


You might try having the students get their slabs ready the week before,
which will give the slabs more time to stiffen on the mold.

I roll out slabs, lay plastic,then another board on top,flip. Take the top
board off & lay down more plastic. To save for longer periods of time, I
lay the extra board back on top & put the whole "sandwich" inside a large
garbage bag. You can stack a lot of "sandwiches" in one bag. If there
might be a drying problem due to the weather or too much heat in the room,
I spray the outside of the first plastic layer with water and add another
piece of plastic.

I've kept slabs workable for a long time using this method.

Valice
in Sacramento